Investigasi Listrik Mikrohidro di Perkebunan Gunung Pasang Kecamatan Panti, Jember
(Micro-hydro Electricity Investigation in Gunung Pasang Plantation of Panti District, Jember)
Investigasi Listrik Mikrohidro di Perkebunan Gunung Pasang Kecamatan Panti, Jember
(Micro-hydro Electricity Investigation in Gunung Pasang Plantation of Panti District, Jember)
Dedy Eko Rahmanto
Program Studi Teknik Energi Terbarukan, Politeknik Negeri Jember, Indonesia
Michael Joko Wibowo
Program Studi Teknik Energi Terbarukan, Politeknik Negeri Jember, Indonesia
Ahmad Fahriannur
Program Studi Teknik Energi Terbarukan, Politeknik Negeri Jember, Indonesia
Abdul Ghofur
Program Studi Teknik Energi Terbarukan, Politeknik Negeri Jember, Indonesia
DOI: https://doi.org/10.19184/j-agt.v16i01.28021
ABSTRACT
Gunung Pasang plantation has a micro-hydro power plant which is used for electricity needs of the factory and the surrounding residents. The micro-hydro power plant is not equipped with an electronic load controller system. The micro-hydro electric voltage can change at any time if there are some changes in consumer load. Micro-hydro electricity investigation is needed to determine the feasibility of the micro-hydro electricity. The investigation was carried out by recording the micro-hydro electricity data which is produced in Gunung Pasang Plantation. Data recording is done by installing a power logger while the micro-hydro turbine operates. The results of the investigation showed that the electric voltage which is generated by Gunung Pasang micro-hydro was fluctuating from less than 100 volts to more than 245 volts with a voltage value that deviated a lot from the 1995 SPLN rule. The average daily voltage which was generated was around 150.34 to 172.18 volts with a standard deviation of 22.11 to 30.67 volts. Micro-hydro operators tried to regulate the work of micro-hydro turbines at all times so the generated voltage could reach the stability. This unstable electrical condition was actually not feasible and had possibility to cause damage to consumer’s electrical equipment. It was necessary to have an electronic load controller system so the outcome of the micro-hydro voltage could be stable and safe.
Keywords: investigation, micro-hydro, voltage
REFERENCES
Ashby, M.F. (2017). Materials Selection in Mechanical Design. Amsterdam: Elsevier.
Aung, N.W., & Ya, A.Z. (2015). Design of electronic load controller by using combination method for micro-hydro power plant and its control and monitoring program simulation. International Journal of Electrical, Electronics, and Data Communication, 3(6), 6-12.
Bachtiar, A., & Natalinus, N. (2013). Pengaruh perubahan tegangan sumber terhadap karakteristik faktor daya pada lampu hemat energi. Jurnal Teknik Elektro, 2(1), 33-41.
Giri, A.R., Shrestha, B., & Sinha, R. (2017). Performance analysis of microcontroller based electronic load controller. Kathmandu University Journal of Science, Engineering, and Technology, 13(1), 20-35.
IMIDAP. (2010). Modul Pelatihan Studi Kelayakan Pembangunan Mikrohidro. Direktorat Jenderal Listrik dan Pemanfaatan Energi - Departemen Energi dan Sumber Daya Mineral. Jakarta.
Kathirvel, C., Porkumaran, K., & Jaganathan, S. (2015). Design and implementation of improved electronic load controller for self-excited induction generator for rural electrification. The Scientific World Journal, pp. 1-8.
Mott, R., Vavrek, E.M., & Wang, J. (2018). Machine Elements in Mechanical Design 6th Ed. USA: Pearson Education.
PLN [Perusahaan Listrik Negara]. (1995). SPLN 1: 1995. Tegangan-Tegangan Standar, 1-5.
Praptodiyono, S., Maghfiroh, H., Nizam, M., Hermanu, C., & Wibowo, A. (2021). Design and prototyping of electronic load controller for Pico Hydropower System. Jurnal Ilmiah Teknik Elektro Komputer dan Informatika (JITEKI), 7(3), 461-471.
Putra, F.D., Effiandi, N., & Leni, D. (2017). Pengoperasian dan perawatan PLTMH pada Pembangkit Listrik Mikro Hidro (PLTMH) di Sungai Batang Geringging Kota Padang. Jurnal Teknik Mesin, 10(2), 25-30.
Rahayuningtyas, A., Santoso, T., & Furqon, M. (2012). Sistem pengaturan beban pada mikrohidro sebagai energi listrik pedesaan. Prosiding SNaPP: Sains, Teknologi, 3(1), 13-20.
Rahmanto, D.E., & Femintasari, V. (2018). An investigation of dummy load energy in Gunung Sawur 1 Microhydro Power Plant-Lumajang East Java. IOP Conference Series: Earth and Environmental Science, 207(1), p. 012060, IOP Publishing.
Rahmanto, D.E., & Femintasari, V. (2019). Teknoekonomi alat pemurni air menggunakan energi listrik terbuang di PLTMH Gunung Sawur 1 Lumajang. Jurnal Agroteknologi, 13(01), 92-97.
Rahmanto, D.E., & Wibowo, M.J. (2020). Microhydo potential in Gunung Pasang Plantation Panti Jember, East Java. IOP Conference Series: Earth and Environmental Science, 411(1), p. 012068, IOP Publishing.
Published
25-06-2022
Issue
Vol. 16 No. 1 2022: Jurnal Agroteknologi
Pages
29-36
License
Copyright (c) 2022 Jurnal Agroteknologi
How to Cite
Rahmanto, D.E., Wibowo, M.J., Fahriannur, A., & Ghofur, A. (2022). Investigasi listrik mikrohidro di Perkebunan Gunung Pasang Kecamatan Panti, Jember. Jurnal Agroteknologi, 16(1), 29-36. https://doi.org/10.19184/j-agt.v16i01.28021